THE INSPECTORS
As we work to wrap things up, the inspection process has begun. Inspectors from the City of Dallas, the engineering third party inspector and the Texas Department of Licensing and Registration have begun their work. We have passed the first two inspections of electrical and HVAC systems.
Below is the completed hand washing station typical for the classrooms.
Child sized toilets are standard to each of the 10 restrooms.
The glass inserts to the BAC doors.
Each of the seven units that heat and cool the building is managed by a programmable thermostat. These combined with the highly efficient equipment and insulation will make the building economical to operate and comfortable for the students and Guides.

0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home