PART TWO
Our second post today...
The BAC Entrance is complete...
The courtyard sidewalks are complete. This is the walkway travels from Miss Lynne's classroom to the Playground.
Easy accessibility to the parking lot is assured with the extended sidewalk as well as providing additional loading space.
The flooring for the Reception and Library adds great warmth to the space.
Back to work....more later.
